Our proposal to WHO to support the construction of the FFP facili

Our proposal to WHO to support the construction of the FFP facility was consistent with the joint venture with our technology partner. The project comprised the transfer of technology from our partner to fill-finish and package egg-based split virion inactivated influenza vaccine (seasonal and pandemic) to cover initially the domestic market. This included plant design, engineering production, quality control (QC), qualification, validation and regulatory affairs. Milestones of the complete influenza

project are outlined in Fig. 2. The facility will have a capacity for 30 million doses of trivalent seasonal vaccine per year in 10-dose vials, with potential to increase capacity to 60 million doses of southern hemisphere Quisinostat chemical structure formulation. If needed, capacity could be converted to produce approximately 60 million doses of pandemic vaccine, and consideration may be given to extending check details production beyond Mexican

demand. The development plan includes all issues related to the production process – organization planning, engineering layout, remodelling work, documentation, training, procurement of equipment, commissioning, qualification and validation – following international and national regulatory requirements. Once the technology transfer agreement with sanofi pasteur was signed, a recognized pharmaceutical engineering firm was hired to elaborate the master plan for the Cuautitlan facility, based on Birmex’s strategic plan. The consulting firm developed a detailed engineering plan for the FFP and Quality Control facility, including the structural civil engineering, architectonic and masonry layouts, specifications of all necessary systems, equipment and materials. In 2009, the office area was completed and 160 of Birmex’s 700 employees moved in. In addition, the store

house became functional for company-wide these activities. In parallel to this activity, Birmex recruited an international expert team to ensure compliance of the facility with GMP, including regulatory review of the designs and development of the qualification protocols. This part of the project is on track to be completed in mid 2013 with full production planned to start in September 2014, when antigen produced in the sanofi-built plant will be blended, filled and packaged in Cuautitlan. Birmex has acquired much of the critical production and QC laboratory equipment with the same specifications as those of sanofi pasteur at its site in France. Both Birmex and sanofi technicians were involved in the factory acceptance tests for design specifications, alarm systems and functionality of the equipment. Some critical QC laboratory equipment, such as the isolator, autoclaves and washing machines had already passed factory acceptance tests. Additional QC equipment was procured with resources from WHO.

Leave a Reply

Your email address will not be published. Required fields are marked *

*

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>